Search
How Much Will Regular Sealcoating Save Me?
- Aug 15, 2016
- 1 min read
How Much Will Regular Sealcoating Save Me?
Properly timed Sealcoating can save substantial dollars for parking lot owners. Unsealed asphalt areas will require maintenance starting with the second year and may need a one to two inch overlay as early as 5-7 years. If the lot is maintained regularly, savings could be substantial. Savings over a 15 yr. period for a 30,000-sq.-ft. asphalt pavement area could exceed $120,000. The fluctuating price of asphalt could raise or lower this estimate Savings for Residential Asphalt Driveway owners are proportionately less, but no less significant.